Students Rebuild

  • Email Updates
  • Student's Rebuild Blog RSS
  • Project Updates RSS
  • Pick a Challenge
  • About Us
  • Success Stories
  • Contact Us
  • Newsroom
  • Students Rebuild Awards
  • Humanitarian Crises
  • Japan Challenge
  • Haiti Challenge
    • About the Challenge
    • Watch the Film
    • Projects in Action
    • Student Teams
    • Blog
  • For Educators
  • For Students
  • FAQs
  • Haiti Challenge
  • Japan Challenge
  • Humanitarian Crises
  • Press Releases
  • Newsletters
  • Announcements
  • Award Finalists
  • Judging Criteria
  • The Judges
  • FAQ

Breaking Bad Construction at Pele School

Tuesday, February 22, 2011 - 14:04
These days students going to Pele are starting their lessons to the sound of crushing stone. While class at École Baptiste Bon Berger continues under the campus' many wood-framed transitional classrooms, the adjacent concrete school block has attracted the attention of about a dozen men in blue hardhats. On the newly-shored-up rooftop the men are driving sledge hammers into the concrete slab at their feet.

This crew of over a dozen men is composed of unskilled members of the Pele community. Well, unskilled leading up to an extensive demolition training course held by partner organization J/P HRO. With proper technique and equipment, the crew is now tackling the reduction of the condemned school block in alternating shifts.

Design Fellow Schendy Kernizan sent along some photographs of the hammering, and talked about how the Pele demolition was going to work. Perhaps the largest factor is that the demolition will be carried out by hand–no wrecking balls or dynamite, just two crews of eight local laborers (and a couple supervisors) breaking down the building piece by piece. A second alteration to typcial demolition is the transportation of the debris–or lack of transportation. Wherever possible, rubble from the massive two-story block will be sorted on campus–with at least the first story's worth intended to become infill in the new construction. In addition to the substantial reduction of the material footprint of demolition and construction, this process also saves on rubble removal and material delivery trips to a tricky-to-access urban site.

pele school


The helmeted men are ripping out chunks of powdery concrete and lengths of rebar and tossing it onto the vacant courtyard below. They'll be doing this for the next couple months. With as much deliberation taken into the by-hand demolition and material collecting, the Haiti team is hoping to maximize safety and opportunity going into the eventual construction.

demolition

Photos by Schendy Kernizan

Breaking Bad Construction at Pele School has 0 Comments

Add a New Comment

Post new comment

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.

Recent Posts

Ace of Base Isolation
April 27, 2013
Forensics in architecture
April 22, 2013
TeleGhetto: Three Years Later and Making it Big!
April 19, 2013
Saving Historic Elie Dubois
April 10, 2013
CIM School and engineering: explained!
March 28, 2013
more

Haiti Challenge

  • About the Challenge
  • Watch the Film
  • Projects in Action
  • Student Teams
  • Blog
  • Home
  • Privacy Policy
  • Terms of Use
  • Contact Us
© 2013 Copyright